C_TSCM42_65 preparation material

It is obvious that the competition in the IT world is fierce.Everyone is constantly improve their own ability to adapt to the society. C_TSCM42_65 on cert24.com is a prized possession in today’s competitive world and lets you gain knowledge and understanding of  products.

With our  C_TSCM42_65 preparation material, you will be able to pass the exam,we are positive that our C_TSCM42_65 preparation material with questions and answers pdf are the most inexpensive and provide most in-depth solutions for individuals that are preparing for the  C_TSCM42_65 questions and answers.

Our exam specific preparation material holds the verified questions to strengthen your grip on exam basics and enables you to outperform the actual exam session. You can comprehensively learn through our C_TSCM42_65 exam material and put out your level best to become a certified professional.
Our products are highly appreciated among the industry wide professionals,products are commendable throughout the industry. Blend of useful resources have been added to our products, thorough research by our experts becomes revealed through excellent quality of our products.you should pay more attention to our product ,because of its high-quality, you can pass your exam at your first try.

QUESTION NO: 1
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes
Answer: B,D,E
QUESTION NO: 2
Which of the following statements about consumption are correct? (Choose two)
A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent
requirements, depending on the strategy.
Answer: B,D
QUESTION NO: 3
Where can you define the valid receivers for production order costs?
A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant
Answer: C
QUESTION NO: 4
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option
Answer: B
QUESTION NO: 5
What does SAP ERP mean?
A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
Answer: D

Comments are closed.