cert24 IBM 000-198 000-241 Certification Questions and Answers

Difficulty finding the right cert24 IBM 000-198 000-241 Certification Questions and Answers? Don’t leave your fate to cert24.com 000-198 000-241, you should sooner trust cert24.com IBM 000-198 000-241dump or some random IBM 000-198 000-241 download than to depend on a thick Macintosh Service Certification Exam book.The IBM 000-198 000-241 cost is rivaled by its value on the IBM 000-198 000-241 exam papers is tremendous, with an absolute guarantee to pass 000-198 000-241tests on the first attempt.

000-198 IBM Security Access  Manager V7.0 Implementation

QUESTION NO: 1
Which utility provides backup, restore, and extract capabilities for Security Access Manager data?

A. pdinfo
B. pdbackup
C. pdservice
D. pd_backup

Answer: B
QUESTION NO: 2
What pdbackup command restores the contents of an Access Manger archived file on a Windows operating system to a specific folder?

A. pdbackup -a extract
B. pdabckup -a backup
C. pdbackup -a restore
D. pdbackup -a retrieve

Answer: A
QUESTION NO: 3
When performing an upgrade, which utility is used to back up the information in Tivoli Directory Server?

A. ldapadd
B. bulkload
C. idsdb2ldif
D. idscreateldif

Answer: C
QUESTION NO: 4
Which registry is NOT supported by ISAM 7?

A. Lotus?Domino?Lotus?Domino
B. IBM?Tivoli?Directory Server
C. Microsoft Active Directory 2008
D. Sun Java?System Directory Server 7

Answer: A
QUESTION NO: 5
Which statement is FALSE regarding local response redirection?

A. We need to use External authentication interface to implement local response redirection.
B. When local response redirection is enabled, change password must be handled by WebSEAL.
C. When using local response redirection, WebSEAL no longer has the responsibility of generating responses to client requests.
D. When local response redirection is enabled, the redirection is used for all local WebSEAL response types: login, error, informational, and password management.

Answer: A

000-241 IBM Sterling Order Management V9.2, Solution Design

QUESTION NO: 1
A retailer’s delivery rules do not allow shipping for an open box television (TV) that is more than 150 miles away. However, they do support moving this TV through a network of stores that are spread throughout the country, until it reaches a store that supports delivery to the customer. The retailer needs to configure such a multi-hop transfer of inventory through the supply chain and provide an accurate promise date to a customer who is over 1000 miles away from the store with the open box TV. In order to do so, Sterling Order Management considers all the following configuration settings EXCEPT for:

A. Receiving store calendar.
B. Receipt Processing Time.
C. Delivery resource pool capacity.
D. Transfer relationship across stores.

Answer: C
QUESTION NO: 2
A customer purchased a DVD player from a store, and later realized that some of the required features were missing. The customer tries to return the DVD player for a refund, but the sales order cannot be located in the Sterling application. Which type of return should be created in the Sterling application?

A. Refund Order
B. Exchange Order
C. Blind Return Order
D. Speed Exchange Order

Answer: C
QUESTION NO: 3
A customer would like a purchase order (PO) to be “Created”, but it should only treat 80% of future supply as available. This should happen until the PO receives a status update that indicates its been “Approved”, at which point 90% of the future supply can be considered for promising. Future supply can be considered when scheduling orders but should not be considered when releasing the pick instructions to the fulfillment center. In order to model this requirement with MINIMAL custom logic, the solution design must:

A. 1. Create an extended status of PO “Created” which is “Approved”.2. Create a new supply type corresponding to the “Inbound approved” status.3. Map the PO status “Approved” to the supply type “Inbound approved” and status “Created” to supply type “Purchase order placed”.4. Set up the appropriate safety factor of 80% for supply type “Purchase order placed” and 90% for supply type “Inbound approved”.5. Use Inventory considerations to map the demand type corresponding to schedule transaction to future supplies.6. Use Inventory considerations to map the demand type corresponding to release transaction to use only onhand supplies.
B. 1. Create an extended status of PO “Created” which is “Approved”.2. Create a new supply type corresponding to the “Inbound approved” status.3. Map the PO status “Approved” to the supply type “Inbound approved” and status “Created” to supply type “Purchase order placed”.4. Set up the appropriate safety factor of 80% for demand type “Scheduled” and 90% for demand type “Released”.5. Use Inventory considerations to map the demand type corresponding to schedule transaction to future supplies.6. Use Inventory considerations to map the demand type corresponding to release transaction to use only onhand supplies.
C. 1. Create an extended status of PO “Created” which is “Approved”.2. Create a new supply type corresponding to the “Inbound approved” status.3. Map the PO status “Approved” to the supply type “Inbound approved” and status “Created” to supply type “Purchase order placed”.4. Use Inventory considerations to map the demand type corresponding to schedule transaction to future supplies.5. Use Inventory considerations to map the demand type corresponding to release transaction to use only onhand supplies.6. Implement the Supply corrections user exit to only show 80% or 90% of supply as applicable.
D. 1. Create an extended status of PO “Created” which is “Approved”.2. Create a new supply type corresponding to the “Inbound approved” status.3. Map the PO status “Approved” to the supply type “Inbound approved” and status “Created” to supply type “Purchase order placed”.4. Use Inventory considerations to map the demand type corresponding to schedule transaction to future supplies.5. Use Inventory considerations to map the demand type corresponding to release transaction to use only onhand supplies.6. Implement the Availability corrections user exit to only show 80% or 90% of supply as applicable.

Answer: A

Comments are closed.